Monkwearmouth Station Museum Railway Wagon Restoration Project – The Story of the Sidings

monk 001small

In order to get firm foundations one of the first jobs was driving piles into the ground. The equipment to do this had to have very low levels of vibration so as not to affect the railway (courtesy of Meldrum Construction)

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *