The Neptune Shell Shop bracelet and the response to the shell crisis of 1915 – Part 1

DS.SWH.5.3.2.3.2

Rough shell body forgings being stacked outside the shell forge. Just over a third were machined and finished in the Neptune Shell Shop.

6″ Shell bodies being stacked outside the shell forge in Neptune Engine Works. TWAS : DS.SWH.5/3/2/3/2

Cranes stacking 6″ shell bodies.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *