Monkwearmouth Station Museum Railway Wagon Restoration Project – The Restoration Begins!

Moving the wagons outside

The most exciting part of our Wagon Restoration Project began several weeks ago with the arrival of tradesmen from Rampart Carriage & Wagon Services to Monkwearmouth.  With their bespoke shed finished (and looking fantastic!) the wagons are currently undergoing a meticulous restoration.  The two wagons, a Covered Carriage Truck and a Goods Brake Van, both played significant roles in the history of the region; the movement of freight on the railways was critical for the social and economic development of Britain and the prosperity of the North East.  When the restoration is complete, visitors will have an opportunity to explore this exciting piece of Sunderland’s railway heritage in an immersive new display.  But first, the restoration…!

Restoration work on the Goods Brake Van's roof begins

Before we could embark on this exciting project, we needed to determine exactly what restoration work the wagons required.  Our Engineering Conservation Officer created a report, outlining the work to be done.  He concluded that the wood timbers and framing on the body and steps of the wagons were rotted, and need to be replaced.  The metal work was declared mainly sound, but a significant amount of surface corrosion needs to be cleared.  Additionally, the roofs of both wagons are weathered and show signs of deterioration.

Inside the Covered Carriage Truck

Inside the Goods Brake Van

Once we knew which aspects of the wagons required attention, we were able to create a tender documentation, outlining the project.  In November we made initial contact with five restoration companies, and by January had received detailed tenders from two companies.  We were particularly impressed with Rampart Carriage & Wagon Services’ proven track record and competitive pricing.  Following an interview in February, we selected Rampart for the project, and the restoration work began in mid-May.

Inside Rampart's workshop in Derby, where some of the restoration work will occur

Rampart, based in Derby, employs a team of multi-skilled tradesmen who plan to finish the restoration project within seven weeks. With a flexible and innovative approach to the project, their commitment and skills will ensure integrity and recognition of the historical status of the wagons as well as their particular conservation requirements.  Rampart has previous experience with timber framed vehicles, having successfully restored a 1912 Lancashire and Yorkshire Railway dynamometer car, a 1921 Pullman observation car, a 1948 Southern Railway brake coach, and a 1951 Great Western Railway sleeping car.

1921 Pullman observation car before restoration

1921 Pullman observation car after Rampart's restoration

As the restoration project unfolds, we find ourselves once again in the tendering process.  The next step is to interview and appoint a team of designers to assist us with our innovative, interactive display in the Sidings shed.  The project will be completed in the autumn, but visitors can stop by before that to see for themselves how the wagon restoration is progressing.

2 Responses to Monkwearmouth Station Museum Railway Wagon Restoration Project – The Restoration Begins!

  1. Good to see this important work being carried out at this wonderful museum. Ramparts are currently carrying out the restoration of a complete five car Brighton Belle set. This all-Pullman electric train was built in 1932 and was the first all steel inter-city train in Britain. At the end of this demanding four year project – the largest rail restoration programme ever carried out – the train will return to mainline running in 2013, 41 years after its withdrawal from service by BR in 1972.

  2. CHRIS WOOD says:

    Good morning.

    I would like to introduce Rail Restorations to you as a skilled coach building works based in the North East. (Shildon). We overhaul rail stock as well as road vehicles.

    In addition we are building the new G5 here and are looking at other projects to build at Shildon.

    I was wondering if you use outside contractors to undertake any of your engineering work? If so would you be interested in using us?

    Kind regards

    Chris Wood

Leave a Reply

Your email address will not be published. Required fields are marked *

What is 8 + 5 ?
Please leave these two fields as-is:
IMPORTANT! To be able to proceed, you need to solve the following simple math (so we know that you are a human) :-)